To serve the growing community and aging population, the Henry Mayo Hewhall Hospital had to expand.
As part of their major long-term planning project, the Henry Mayo Newhall Hospital began construction on a new inpatient Patient Tower in 2016. Opened in 2019, the Patient Tower includes up to 142 additional patient beds, a new 29-bed Women’s Services Unit, and three new medical/surgical units with 30 new medical/surgical beds in each unit. The Patient Tower will also include a permanent rooftop helipad with direct access to the Emergency Department and expanded laboratory and materials management space.
In support of the Patient Tower, a new loading dock and central utility plant were also constructed.
CSI Electrical Contractors, Inc. teamed up with Bernards and HMC Architects to provide all electrical construction on this project along with partnering with M-E Engineers for electrical engineering. Our team installed all low voltage systems including fire alarm, structured cabling, nurse call, security, real time location system, public address, and emergency responder DAS.
-
Location
Valencia, CA
-
Project Size
163,000 SF
-
General Contractor
-
Architect
-
Engineer
-
Engineer