Overview

Since 1913, City of Hope has been fighting against life-threatening illnesses while affirming their vision that “health is a human right.” In pursuit of this fight, City of Hope has begun executing a 20-year expansion plan to enhance its research and treatment facilities across the United States.

In December 2019, CSI joined forces with DPR Construction to aid City of Hope in their latest endeavor: the City of Hope Duarte Outpatient Clinic. Despite the challenges of the pandemic, CSI set out on an extraordinary feat, designing and constructing a ground-up OSHPD 3, 8-story highrise with a basement. At the highest peak, CSI had 53 workers on site working to complete this 351,988 SF building.

The Duarte Outpatient Clinic features state-of-the-art equipment for cancer treatment and care, including spaces for radiology, radiation oncology, MRIs, Fluoroscopy, CAT and PET Scans, other imaging suites, nuclear medicine, cleanroom labs, an IR PACU, and patient care areas with infusion bays.

After three years of unwavering dedication, including periods during the pandemic and significant weather delays and challenges, the Duarte Outpatient Clinic is complete.

Project Highlight

In recognition of the extraordinary efforts and excellence demonstrated in this project, CSI was honored with the 2024 Prestige Diamond Award for Electrical Excellence and a 2024 Electrical Excellence Award for Voice / Data for the Duarte Outpatient Clinic from the Los Angeles National Electrical Contractors Association (NECA).

We are incredibly proud to partner with City of Hope and are confident that their efforts will save lives for future generations.

Click on the video below to learn more about this project.

Overview

The Cherese Mari Laulhere Children’s Village at Long Beach Memorial Hospital is a new, ground-up, 80,000 SF, four-story medical office building for pediatric patients.

CSI Electrical Contractors, Inc. partnered with Turner Construction to complete this design-assist, OSHPD-3 project, which included a pharmacy, exam rooms, treatment rooms, and multiple pediatric therapy gyms. CSI worked alongside tk1sc to design, model, and construct the electrical infrastructure required, including a new 3000A service, lighting, and wireless lighting controls.

The Children’s Village is another project CSI has safely and successfully executed at the Long Beach Memorial Campus.

Overview

To increase efficiency and capacity for COVID-19 testing, PerkinElmer, a Massachusettes-based diagnostics company, partnered with the State of California to open the new DGS COVID-19 Temporary Lab in Valencia, CA.

CSI Electrical Contractors, Inc. joined Hensel Phelps to complete this design-build tenant improvement of the 134,287 SF existing industrial building. The facility consists of multiple large rooms with open workspaces, lab equipment, refrigerators and ovens, clean rooms, offices, H-3 storage rooms, and a second-floor mezzanine with administrative spaces to accommodate the 300+ employees working to process tests.

The DGS COVID-19 Temporary Lab had several notable achievements, with the first being that CSI completed our work within a 7-week time frame. Second, given the nature of work performed in the facility, the facility needed a backup generator, usually taking months to acquire. CSI was able to locate, purchase, deliver, and install the permanent backup generator in 2 weeks. Third, CSI installed a completely new electrical distribution system, including UPS, switchgear, and ATSs.

  • Location

    Valencia, CA

  • Project Size

    134,287

  • General Contractor

    Hensel Phelps

  • Architect

    Smith Group

  • Engineer

    CSI Electrical Contractors, Inc.

Overview

Kaiser Permanente leads the way with their next generation medical office building.

To meet the growing needs of Kaiser Permanente members in Los Angeles, CA, Kaiser Permanente transformed 3 floors of an existing office building into medical offices for Internal Medicine, Pediatrics, Psychiatry, Social Medicine, Radiology, Family Medicine, OB/GYN, Nurse Clinic, Pharmacy, and Laboratory.

This high-tech facility features digital ID cards, express check-in, and enhanced integrated technology setting a benchmark for other Kaiser Permanente facilities to follow suit.

CSI partnered with Layton Construction to complete the tenant improvement buildout which included technology equipment rooms, copper and fiber distribution cabling, and a new DC Lighting System.

Project Highlights

The Kaiser Permanente Hollywood Romaine MOB’s lighting is one of the first of its kind within Kaiser Permanente and was designed entirely of 24v DC open cable distribution.

Overview

The Kaiser Regional Reference Laboratory is Kaiser’s newest and most state-of-the-art 24-hour specimen reference laboratory servicing all of Southern California.

CSI Electrical Contractors, Inc. provided tenant improvement to the existing tilt-up building, which included adding a 2,500kW Diesel generator and a 600kva UPS system. In addition, this project was a successful co-location construction delivery method with DPR Construction.

Overview

To serve the growing community and aging population, the Henry Mayo Hewhall Hospital had to expand.

As part of their major long-term planning project, the Henry Mayo Newhall Hospital began construction on a new inpatient Patient Tower in 2016. Opened in 2019, the Patient Tower includes up to 142 additional patient beds, a new 29-bed Women’s Services Unit, and three new medical/surgical units with 30 new medical/surgical beds in each unit. The Patient Tower will also include a permanent rooftop helipad with direct access to the Emergency Department and expanded laboratory and materials management space.

In support of the Patient Tower, a new loading dock and central utility plant were also constructed.

CSI Electrical Contractors, Inc. teamed up with Bernards and HMC Architects to provide all electrical construction on this project along with partnering with M-E Engineers for electrical engineering. Our team installed all low voltage systems including fire alarm, structured cabling, nurse call, security, real time location system, public address, and emergency responder DAS.

Overview

Home to world-class laboratories, medical offices, and transit parking, Emerystation West is the latest addition to the Emerystation Campus.

Located in the heart of the East Bay Innovation Corridor, Emerystation West provides a vast number of amenities and exceptional transportation options. The facility includes 7 levels of laboratory, medical, and office space above a 2-story transit and parking podium.

CSI Electrical Contractors, Inc. provided all electrical construction on this project.

Overview

As the latest expansion to Keck Medicine of the University of Southern California, the Norris Healthcare Center is a world-class specialty care facility.

The Norris Healthcare Center specializes in cancer care, women’s specialty care, urology, and a variety of transplant procedures. This center also includes a pharmacy, outpatient surgery center, and an infusion clinic.

CSI Electrical Contractors, Inc. partnered with DPR Construction to provide all electrical construction at the Norris Healthcare Center which included Design-Assist and Building Information Modeling (BIM) for this 7-level, OSHPD 3 (with OSHPD 1 components) medical office building.