Baldy Mesa Solar Photovoltaic (PV) Clean Energy
Baldy Mesa Solar Photovoltaic (PV) |
|
|---|---|
| Client | AES US Renewables & Power |
| Completion Date | 2024 |
| Location | Adelanto, CA |
| General Contractor | CSI Electrical Contractors, Inc. |
| Architect | Kimley-Horn |
| Engineer | Civil/Mechanical: Kimley – Horn, Electrical: RRC |
The Baldy Mesa Solar Project is a solar farm and battery storage generation project located in Adelanto, California. This project consists of a DC Coupled System with 195 MW DC (PV) and 300 MWh DC of battery storage system (BESS). This project has (29) Power Blocks with (2) GP Tech Inverters and (14) Fluence GEN6 Battery Enclosures at each power block, on (6) collector circuits to feed (3) bifurcated breakers within the 115kV: 34.5kV Project Substation.