Baldy Mesa Battery Energy Storage System Clean Energy
Baldy Mesa Storage (BESS) |
|
|---|---|
| Client | AES US Renewables & Power |
| Completion Date | 2026 |
| Location | Adelanto, CA |
| General Contractor | CSI Electrical Contractors, Inc. |
| Engineer | David Evans and Associates |
The Baldy Mesa Storage Project is a battery storage generation project located in Adelanto, California. This project consists of a AC Coupled Battery System with 238 MWh DC of battery storage system (BESS). This project has (98) Gridstack Pro 2000 Enclosures with (14) Gamesa Proteus PCS Inverters and (7) Gridstack Pro 2000 Enclosures at each core, on (2) collector circuits to feed (1) MV breakers within the 115kV: 34.5kV Project Substation.