Baldy Mesa Battery Energy Storage System Clean Energy

Baldy Mesa Storage (BESS)

Client AES US Renewables & Power
Completion Date 2026
Location Adelanto, CA
General Contractor CSI Electrical Contractors, Inc.
Engineer David Evans and Associates

The Baldy Mesa Storage Project is a battery storage generation project located in Adelanto, California. This project consists of a AC Coupled Battery System with 238 MWh DC of battery storage system (BESS). This project has (98) Gridstack Pro 2000 Enclosures with (14) Gamesa Proteus PCS Inverters and (7) Gridstack Pro 2000 Enclosures at each core, on (2) collector circuits to feed (1) MV breakers within the 115kV: 34.5kV Project Substation.