Overview

Inspired by Route 66 and the Pacific Coast Highway, Behr’s headquarters is a modern workspace that has all the bells & whistles.

CSI Electrical Contractors, Inc. joined Behr on this 3-story TI renovation to create multiple eye-catching spaces. Our work included electrical construction on the executive offices, administrative support space, R&D lab space, warehousing, a new gym facility, an indoor-outdoor space, a commercial kitchen, and the “Behr Den”.

  • Location

    Santa Ana, CA

  • Project Size

    225,280 SF

  • General Contractor

    DPR Construction

  • Architect

    H. Hendy Associates

  • Engineer

    tk1sc

“CSI has been a trusted partner for a long time; they are committed to strategic alignment and planning during the preconstruction phase, they execute on some of our toughest projects with a complete level of partnership when faced with a challenge, and that sets us up well for a successful project closeout with our clients.”

Justin Awde – DPR Construction
Overview

Measured as the largest solar array on a municipally owned convention center in the United States, the Los Angeles Convention Center added 2.21 megawatts to their existing facility.

This addition brings LACC’s total solar power generated to 2.58 megawatts.

This project included installing 6,228 panels at 355 watts each which is projected to generate 3.4 million kilowatt hours per year, which is around 17% of the Los Angeles Convention Center’s annual energy usage.

  • Location

    Los Angeles, CA

  • Project Size

    2.21 Megawatt

  • Architect

    PermaCity

  • Engineer

    CSI Electrical Contractors, Inc.

DCIM\100MEDIA\DJI_0031.JPG
Overview

As Ooyala grew, so did their need for office space.

Ooyala, a media company connecting and powering the content supply chain, needed to expand their office in Santa Clara, California to accommodate 200 additional employees. CSI Electrical Contractors, Inc. partnered with Skyline Construction and HGA Architecture to provide tenant improvement to this 63,000 SF space creating a high-functioning and eye-catching design.

Ooyala, which means “cradle” in the Indian Language of Telugu, used the concept of the cradle throughout the entire design. Every inch of the space was created with connectivity in mind by building, designing, and lighting spaces that encourage collaboration and a healthy work environment.

Ooyala
Project Highlights

One of the key features of this office space is a 25-foot collaboration tunnel inspired by a camera’s zoom lens that connects the entire office.

Overview

The Annenberg Petspace is devoted to promoting and strengthening the bonds between humans and animals through adoption, education, and leadership.

Opened in 2017, the Annenberg Petspace is a unique community space where people can come to play, adopt, learn, and grow. This 2-story LEED Platinum, 30,000 SF space is home to more that 80 rescued dogs, cats, and rabbits from the Los Angeles County Department of Animal Care and Control and is run by 30 staff and over 100 volunteers.

CSI Electrical Contractors, Inc. partnered with Matt Construction to provide all electrical construction to the facility which included pet adoption spaces, play areas, an education center, and a leadership institute.

The Annenberg Petspace is an extension of the philanthropic work of Wallis Annenberg through the Annenberg Foundation. To learn more about the foundation, click here. To visit the Annenberg Petspace, click here.

PetSpace, Storyline, architecture, interior
Project Highlights

The Annenberg Petspace is a site to behold. Upon entry, guests are greeted by a giant animatronic dog which sets the playful tone for the visit. In addition, guests can run in a human-sized hamster wheel, learn about the animals through interactive touch screens throughout the facility, and meet and greet the animals in several designated community spaces.

The entire building is smart featuring multiple touch screens throughout the facility. Some areas also include touch screens to control electrified viewing windows that go from frost to clear to view grooming, surgeries, or the animals that are not quite ready to come out and play.  

Overview

Home to word-class laboratories, medical offices, and transit parking, Emerystation West is the latest addition to the Emerystation Campus.

Located in the heart of the East Bay Innovation Corridor, Emerystation West provides a vast number of amenities and exceptional transportation options. The facility includes 7 levels of laboratory, medical, and office space above a 2-story transit and parking podium.

CSI Electrical Contractors, Inc. provided all electrical construction on this project.

Overview

City of Hope is a world leader in the research and treatment of cancer, diabetes, and other serious diseases.

Ranked as one of the nation’s “Best Hospitals” in cancer by U.S. News & World Report for more than a decade, City of Hope delivers scientific miracles that make lives whole again.

CSI Electrical Contractors, Inc. partnered with DPR Construction to deliver design build tenant improvements to this 140,000 SF project beginning with a 10,000 SF dry lab tenant improvement to help researchers begin work in the facility quickly. The project also included the renovation of an existing 2-story commercial office building to a state-of-the-art cancer research facility which included a new ground-up central utility plan to support the new lab space.

Overview

Eataly, a premier destination to shop, eat, and learn, opened their newest 3-story location at the Westfield Century City Shopping Complex in Los Angeles, CA.

With multiple restaurants and cafes, a commercial kitchen, an Italian market, and rooftop lounge, Eataly has created a space that unites the community around a love for Italian food.

CSI Electrical Contractors, Inc. partnered with Clune Construction to help bring this project to life by providing tenant improvement throughout the 3-level complex which included work on four restaurants, nine take-away food spaces, a culinary school space, two chilled wine storage rooms, a roof top bar, back-of-house area, office space, and employee break rooms.

 

Project Highlights

Eataly features an in-house greywater system that recycles 33% of the used water from hand washing sinks and condensation from refrigeration units and re-uses it to water plants and other locations throughout the venue.

Overview

From sound stage to high-end event venue, Three Labs is a visually stunning space suited for your next event or production.

Located in Culver City’s historic Hayden Tract, Three Labs Innovative Production & Event Facility boasts high-vaulted ceilings with curved glue-lam beams making way for the unique lighting that is a focal point for the space. This renovation included a complete overhaul of the sound stage to create a single open space, new subterranean garage, entrance lobby, restrooms, office space, and additional event rooms.

  • Location

    Culver City, CA

  • Project Size

    59,527 SF

  • Architect

    Profeta | Royalty

  • Engineer

    CSI Electrical Contractors, Inc.

Project Highlights

To create additional parking to support the venue, the entire structure was excavated and then elevated to make an underground parking garage.

Overview

After being vacant for years, the historic Hotel Californian was transformed into a beautiful mainstay of downtown Santa Barbara.

This five-star luxury hotel features 114 rooms with over 20,000 SF of commercial space consisting of paseos, gardens, plazas, and 264 parking spaces. The new renovation incorporated the façade from original 1925 Hotel Californian paired with new construction to create a truly lavish experience for guests.

CSI Electrical Contractors, Inc. provided all electrical work on this amazing property.