PrefabricationModernizing the world around us through innovation

MAXIMIZING PROJECTS WITH PREFAB 

Prefabrication at CSI is more than something we do – it’s a cultural commitment embedded in our team’s processes to improve safety, planning, scheduling, quality, installation efficiency, and reduce waste. We specialize in Building Information Modeling (BIM) and custom fabrication to support each project’s ongoing needs.  

Our dedicated manufacturing team provides our customers with end-to-end fabrication support and innovative solutions for the toughest projects. Whether fabricating underground conduit assemblies, in-wall assemblies, homerun wire harnesses, bus duct packaging, or custom lighting fixtures – when you need it, we build it. 

SAVING TIME & INCREASING PRODUCTIVITY 

Prefabrication brings a level of schedule and budget predictability that our customers and team rely on. By taking advantage of CSI’s prefabrication opportunities, we can reduce project timelines, tighten quality control, and provide greater predictability into your hands from day one. 

On top of that, CSI’s prefabrication efforts allow our team to concentrate dedicated expert labor in a controlled shop environment, reducing risk and labor costs while delivering a level of consistency and stability that gives you peace of mind. 

THE ULTIMATE QUALITY CONTROL 

Before equipment and fabrication assemblies arrive at a project site, our prefabrication team stages, tests, packages, and labels each item to avoid onsite surprises and delays. Building, testing, and labeling each piece of equipment in our controlled environment before site delivery ensures our field teams receive reliable, ready-to-install components. 

SAFER WITH LESS ENVIRONMENTAL IMPACT 

Working in the field means navigating the weather, other trades, and various unknowns. By building and assembling materials and equipment in a controlled facility, we create a predictable environment. This means there are fewer incidents and improved safety for everyone. Our processes also reduce the amount of waste brought to project sites, thereby controlling costs and providing a cleaner, safer work environment for all crews.